
Commercial · Gretna, LA
Commercial crack filling
On a commercial property a crack is not just ugly — it is a trip hazard sitting between the parking lot and your front door, getting wider every wet month.
What this is
Same standard, business hours aware
Same order as always: the concrete gets cleaned and dried first, then the fill goes in and bonds to concrete instead of grime. Filled early, a crack stays a line instead of becoming a claim.
On the ticket
What it covers
- Walkway and entry cracks
- Parking pad and apron cracks
- Fill after a fresh clean, one visit
- Trip-hazard lines flagged while we are there
How it goes
The order of operations is the job
01
Clean the concrete
The surface gets pressure washed first. Fill only bonds to clean concrete.
02
Let it dry
The crack has to be dry before anything goes in it. This step does not get rushed.
03
Fill the cracks
Fill goes in and gets worked flush so it seals the crack instead of sitting on it.
04
Check the lines
Every filled crack gets looked over before the job is done.
Commercial crack filling
Straight answers
Can you work before we open?
Hours are 6am to 6pm every day, so early is the default. A 6am start means most storefront jobs are wrapped before the doors unlock.
How does commercial pricing work?
Same as residential: the property gets looked at, then you get a number. Square footage, surface, and buildup move it, so nothing is quoted off a phone call. The look and the quote are free.
Why does the concrete have to be cleaned first?
Fill bonds to whatever it touches. On dirty concrete it bonds to the dirt, and the first hot week or hard rain pulls it loose. Clean and dry first, fill second — that is why it holds.
While we are there
Other commercial services
For your house instead
The residential version
Commercial quotes
Get a commercial crack filling quote
Name, phone, the property, and what is bothering you about it. The look and the number are both free.
Call or text 305-542-3435 · 6am to 6pm, every day
